Beipiao Dingxin Industry Co., Ltd. Tailings Treatment Project
Project Overview:
Client: Beipiao Dingxin Industry Co., Ltd.
Tailings Amount: 1000 TPH (dry basis)
Tailings Concentration: 13.67%
Project Objective: Maximize the comprehensive utilization of tailings water
Project Solution:
Tailings Treatment Process:
Key Equipment:
Thickener: Supplied by Beijing Huade Chuangye, with a diameter of 50m, a steel structure tank, a sidewall height of 3.5m, a cone angle of 9.5°, and a centrally driven single head with a torque of up to 1200000N·m.
Project Benefits:
Technical Parameters of the Thickener:
Applicable Industries: Tailings dry stacking/filling, coal slime water concentration, black/non-ferrous metal concentrate (tailings) concentration, metallurgical solid-liquid separation & CCD washing and other industrial applications.
Core Components: Tank, drive, bridge, rake, feed well, underflow cone, etc.
Core Components Warranty Period: One year after equipment acceptance.
Product Size: φ50m
Motor Rated Power (KW): 15kw
Warranty Period: One year after equipment acceptance.
Production Capacity: 1000 T/H (dry basis)
Weight: 375t
Project Conclusion:
The Beipiao Dingxin Industry Co., Ltd. Tailings Treatment Project is a successful application of the HD high-efficiency thickener in tailings treatment. The project has achieved remarkable environmental and economic benefits, and has demonstrated the advanced technology and reliable performance of the HD thickener.